翻訳と辞書
Words near each other
・ Line 2, Beijing Subway
・ Line 2, Changsha Metro
・ Line 2, Chengdu Metro
・ Line 2, Chongqing Rail Transit
・ Line 2, Dalian Metro
・ Line 2, Dongguan Rail Transit
・ Line 2, Guangzhou Metro
・ Line 2, Hangzhou Metro
・ Line 2, Nanchang Metro
・ Line 2, Nanjing Metro
・ Line 2, Ningbo Rail Transit
・ Line 2, Shanghai Metro
・ Line 2, Shenyang Metro
・ Line 2, Shenzhen Metro
・ Line 2, Suzhou Rail Transit
Line 2, Tianjin Metro
・ Line 2, Wuhan Metro
・ Line 2, Wuxi Metro
・ Line 2, Xi'an Metro
・ Line 21, Guangzhou Metro
・ Line 3
・ Line 3 (Athens Metro)
・ Line 3 (Budapest Metro)
・ Line 3 (Madrid Metro)
・ Line 3 (Metrovia)
・ Line 3 (Mumbai Metro)
・ Line 3 (Saint Petersburg Metro)
・ Line 3 (São Paulo Metro)
・ Line 3 Scarborough
・ Line 3, Beijing Subway


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Line 2, Tianjin Metro : ウィキペディア英語版
Line 2, Tianjin Metro

| image = A returning train in KONGGANGJINGJIQU Station of Tianjin Metro Line 2.jpg
| image_width = 265px
| image_alt =
| caption = A train at Konggangjingjiqu
| type = Rapid transit
| system = Tianjin Metro
| status = Operational
| locale = Tianjin, China
| start = Caozhuang
| end = Binhai International Airport
| stations = 19
| routes = 1
| ridership =
| open = 1 July 2012 (trial)
| close =
| owner = Tianjin
| operator = Tianjin Metro Corporation
| character = Underground
| depot =
| stock =
| linelength =
| tracklength =
| notrack = 2
| gauge =
| el =
| speed =
| elevation =
| website =
| map =
| map_state = collapsed
}}
Line 2 of the Tianjin Metro () is a rapid transit line running from west to east Tianjin. Opened on 1 July 2012,〔(天津地铁2号线7月1日起分段开通试运营 公交接驳地铁方便出行 )〕 the line is 23.5 km long and has 19 stations. It is mostly underground; all stations, with the exception of surface-level station Caozhuang, are underground.
In May 2011, during construction, a section of tunnel west of Tianjin Railway Station was flooded with water from the Hai River and collapsed, trapping one of the TBMs. It was deemed too expensive to remove the trapped TBM, so a decision to abandon the TBM and dig a new tunnel around it was made. This delayed the original opening date from late 2011 to 2012. 〔()〕 After the line opened for trial operations on 1 July 2012, it operated in two separate sections until the affected section finished reconstruction and Jianguodao Station opened on 28 August 2013, finally reconnecting the two sections.
==Stations (west to east)==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Line 2, Tianjin Metro」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.